Project Overview

A big push from the team to get this slab ready for tomorrow’s pour! This job called for double waffle pods, N16 reinforcement bar throughout, and a deep edge all the way around to deliver strength and compliance for the build ahead.

Scope of Work

  • Site prep and base layout
  • Installation of double waffle pod system
  • Placement of N16mm reinforcing bar across the slab
  • Deep edge formwork for structural stability

The slab is fully reinforced, set out to engineering specs, and ready for a smooth pour. Another strong foundation in the making, delivered on time by the Red Earth team.